
We moved right along into the kitchen. We managed as little disruption as possible.

Dealing with the fridge was easy, we just moved it out and floored under it. The stove was a bit harder, as a space hadn't been left for the floor to slip under the stove feet. We wedged up the stove and angled the boards underneath. Rick was very pleased with the results.

So the kitchen was finished. But, instead of finishing the boards right away (gym spar), we decided to move right along into the dining area. And keep the progress going.